SHINRAIMATERIALS & INFRASTRUCTURE
Based in Ipoh · Serving Perak

Sand, Red Earth &
Aggregate Supplierin Ipoh, Perak.

Material supply for projects across Perak.
Explore sand, topsoil, red soil and aggregates, and estimate the quantity you need.

Lorries and an excavator at a red earth loading areaRed earth loading & transport
SAND / RED EARTH / AGGREGATESBASED IN IPOH. FOCUSED ON PERAK.
Building materials

Start with the
right material.

Supplying projects in Perak. Material suitability, availability and delivery arrangements are confirmed against your project requirements.

Sand supply

The right grade.
The right application.

Mining sand, washed coarse sand and fine sand options. Share your intended application and material specification so we can discuss an appropriate supply.

Enquire about sand ↗
Quotation depends on specification, quantity, delivery location and current availability. Testing and acceptance requirements should be agreed before supply.
Plan your material order

How much do you need?

Estimate cubic metres and metric tonnes, then add the result to your quotation enquiry.

Editable planning assumptions: sand 1.60, red earth 1.50, aggregates 1.60 t/m³. These are not measured Shinrai product densities. Confirm density, moisture, grading and any compaction allowance before ordering. The calculator does not automatically convert compacted volume to loose delivery volume.

For topsoil, enter an agreed bulk density; no default is supplied.

Your estimated requirement

Enter your dimensions or known volume, then calculate.

Planning estimate only. Final supply quantity and quotation are confirmed with the team. Actual delivered weight is established by weighbridge records.

How it is calculated

Volume = length × width × depth (all converted to metres). Estimated tonnes = volume × bulk density. Extra allowance is applied to both volume and tonnes. All weights use metric tonnes (1,000 kg).

Reference: material density varies with condition ↗

Lorry sizes & planning capacities

LorryInternal body dimensions suppliedLevel volumeSand estimate at 1.6 t/m³
6-wheel13 ft × 7 ft × 20 in4.29 m³6.9 t
10-tyre21 ft × 84 in × 30 in10.41 m³16.7 t

Sand is quoted by metric tonne; final delivered weight is confirmed by weighbridge net weight. Red earth and topsoil quantities are planned in m³. Volumes assume internal dimensions and level loading; moisture and grading affect sand weight. Actual loading must comply with permitted payload. The soil delivery calculator retains its 10 m³ planning load for the larger tipper; 6-wheel transport requires a separate quotation.

Recommended sizes only. Actual tipper body dimensions and capacities vary between lorries. Excavator/loading bucket sizes also vary, so bucket counts alone do not establish an exact delivered volume. Confirm the assigned lorry, agreed load quantity and permitted payload before delivery; use weighbridge net weight for sand sold by tonne.

Also part of Shinrai

Infrastructure &
sewerage works.

Alongside material supply, Shinrai Construction undertakes infrastructure and sewerage works, mainly in Perak. Contact us to discuss your scope, drawings and site requirements.

Discuss infrastructure works ↗
Formwork and reinforcement along a site boundarySite work in progress ↗
01

Infrastructure

Civil infrastructure works to your project scope and specifications.

Concrete pipeline laid in an excavated trench
Concrete pipe installation
02

Sewerage

Sewerage pipelines, manholes and associated installation works.

Sewerage pipes and fittings at the project site
Sewerage materials on site
The Shinrai business

Materials first.
Built on experience.

Based in Ipoh, Shinrai mainly supplies sand, aggregates and red earth for projects in Perak. Our construction business also undertakes infrastructure and sewerage works. Share your material specification, quantity and site location to start a quotation discussion.

Shinrai Construction
Infrastructure & sewerage works
Shinrai Construction Building Materials Sdn Bhd
Sand, aggregates & earth supply
How to get started

Clear scope. Clear next steps.

01

Share the brief

Send the location, drawings or specifications, quantity and required date.

02

Review the scope

Confirm the material specification, quantity, site access and delivery requirements.

03

Agree the quotation

Confirm pricing, scope, payment terms and responsibilities before work begins.

04

Coordinate the work

Coordinate loading and delivery arrangements with your site team.

Your next project

Let’s supply
your next project.

Tell us your material, quantity and delivery location in Perak. Use the calculator above if you need a starting estimate.

BASED IN IPOH, PERAK
Main operating area: Perak.
Delivery feasibility and site access confirmed on enquiry.

Open Shinrai Tanah Merah in Google Maps ↗
Call 017-452 3099

Create your brief, then send it to Shinrai on WhatsApp. Review the message and tap Send in WhatsApp; nothing is sent automatically. Your details stay in this browser session.

Calculate quantityPrepare enquiry ↗